We perform installation of permanent fall protection systems for work at heights.

Certex workflow for permanent fall protection systems consists of six steps:

1. Site visit and risk analysis
2. Calculation and quotation
3. Pre-inspection and installation
4. Inspection of complete system
5. Staff training
6. Maintenance and inspection

How exactly the process looks at your particular workplace, you decide in close cooperation with our knowledgeable staff.

Examples of areas where permanent fall protection systems may be necessary:
- ;ines
- Refineries
- Power plants
- Ski resorts
- Sports and theater facilities
- Ships
- Offshore
- Bridges

Permanent fall protection systems facilitate high-altitude work and Certex offer a comprehensive range of vertical and horizontal fall protection systems.

Contact your local Certex office for more information.

Image
Currently this product cannot be added to an online quote. Please contact us directly for enquires.

Download CAD

Download CAD by choosing the desired product from the table above and the format from the menu below. Click "Get CAD" and after the load reaches 100% you can click on the download icon to download it. Please note that CAD drawings are only available if the icon at the right side of the table above is colored and not grayed out.

Get CAD
Download